§214.8.5. Capital improvement program
Any project which is proposed for inclusion in an annual basin plan that is not
included in the basin master plan or the Atchafalaya Basin Floodway System, Louisiana
Project shall first be reviewed, studied, and analyzed by the technical advisory group. The
board may consider the proposal, and if approved, the project shall be included in an annual
plan for presentation to the legislature for its approval.
Acts 2018, No. 570, §3, eff. July 1, 2018.