Skip Navigation Links
      RS 51:2370.34     

  

§2370.34. Reporting requirements

            A. Any GUMBO 2.0 grantee shall report all instances of known damage to existing underground utilities that occur during the construction or installation of broadband infrastructure funded by GUMBO 2.0.

            B. Reports shall be submitted to the office in a monthly report once construction has begun.

            C. The report shall include all of the following:

            (1) The date and location of the incident.

            (2) A description of the damage caused.

            (3) Steps taken to address the damage.

            D. Failure to report such incidents may result in the suspension of GUMBO 2.0 funding.

            Acts 2024, No. 632, §1.



If you experience any technical difficulties navigating this website, click here to contact the webmaster.
P.O. Box 94062 (900 North Third Street) Baton Rouge, Louisiana 70804-9062