§912.22. Installation standards for manufactured and modular homes
All manufactured and modular homes shall be installed to meet the following
standards, unless otherwise specified in this Part:
(1) Installation standards for the setup of new manufactured homes shall be in
compliance with the manufacturer's installation instructions. Installation for the setup of
new or used modular homes shall be in compliance with the International Residential
Code enforced by the local authority having jurisdiction.
(2) Installation standards for the setup of used manufactured homes shall be in
compliance with the manufacturer's installation instructions, if available. In the absence
of the manufacturer's installation instructions, used manufactured homes shall comply
with the provisions of this Part.
(3) All anchors, piers, and tie-down components used in the installation of
manufactured homes shall be tested and meet the minimum industry standards.
Installation of such anchors and components shall be in accordance with the
manufacturer's instructions.
(4) As to site preparation, the under-home grade, or ground, shall be cleaned of all
vegetation and organic material, such as stumps, roots, etc., except grass not exceeding
three inches in height. The area beneath and around the home shall be crowned, sloped or
properly drained so that water will not flow or accumulate under the home. All grass and
organic material shall be removed and the pier foundation placed on stable soil or
compacted fill. When the soil compaction or soil-bearing capacity is not known, the local
building authority in the locale may be consulted or a reading by the use of a pocket
penetrometer may be obtained. The bottom of the footer or footers shall be placed on
stable soil. The pier foundation shall be a minimum of three and one-half inches by
sixteen inches by sixteen inches solid concrete pad or equivalent, precast or poured in
place, or approved material by the regulatory agency. The regulatory agency, or its duly
authorized representatives, shall cause products to be analyzed or tested to require that the
pier foundation products have a deflection of not more than three-eighths inch under
design load. Such testing may be conducted by an independent third party qualified and
approved by the agency. Previous testing data submitted in other jurisdictions may be
considered by the agency. Where the manufacturer's specifications have additional
requirements other than the above, the more stringent shall apply. The landowner shall be
responsible for proper site preparation in accordance with this Paragraph.
(5) All manufactured homes shall be anchored with an approved anchor system.
All auger systems shall be installed to a minimum depth of thirty inches, or two and one-half feet, in undisturbed or compacted soil. Piers are to be installed off center of the
anchors so as not to interfere with the proper alignment of the strapping. Anchors may be
installed in predrilled holes, provided the anchor penetrates a minimum of two feet into
undisturbed soil beyond the predrilled hole. When the anchor manufacturer's installation
instructions permit, the hole is then backfilled with soil compacted in layers not
exceeding six inches. For manufactured homes produced after July 13, 1994, the installer
shall refer to the manufacturer's setup manual for the ultimate load requirements for
anchors at the different tie points on the manufactured home. For used manufactured
homes when the manufacturer's setup manual is not available, all anchor points at side
walls, shear walls, end walls, centerline, and other points as identified by the
manufacturer, shall be certified for an ultimate load of four thousand seven hundred
twenty-five pounds. Anchors are required one at each end of shear walls; one on each end
of each I-beam; one frame tie at each vertical tie point; one in each end of each marriage
wall, centerline; and on each ridge beam support post.
(6) Frame tie ground anchors shall have approved stabilizing devices installed on
the inside, in the direction of pull, with the top of the stabilizing plate driven flush with
the soil unless otherwise specified by the manufacturer's guidelines.
(7) Piers or load-bearing supports or devices shall be installed and constructed to
evenly distribute the loads. Steel piers with mechanical adjustments shall be securely
attached to the frame of all manufactured homes. Manufactured load-bearing supports or
devices shall be listed and approved for the use intended, or piers shall be constructed as
outlined in this Part. Concrete products shall comply with the minimum dimensional and
structural requirements for load-bearing. Solid and cell concrete blocks shall be to the
standard specification for load-bearing concrete masonry units, ASTM C-90, 1993
Edition. Poured concrete shall be a minimum of FCL = 2500 PSI. All plastic products
shall be conditioned at ASTM D 618-61, reapproved 1990, standard practice for
conditioning plastics and electrical insulating materials for testing. Plastics shall be tested
to the ASTM D 790-92 standard test methods for flexural properties or unreinforced and
reinforced plastics and electrical insulating materials, ASTM D 732-85 standard test
method for shear strength or plastics by punch tool, and ASTM G 53-88 standard practice
for operating light and water exposure apparatus for exposure of nonmetallic materials.
(8)(a) In flood-prone areas, the foundation shall comply with the requirements set
forth in the manual, Manufactured Home Installation In Flood Hazard Areas, published
by the Federal Emergency Management Agency (FEMA). Nothing in this Paragraph shall
be construed to prohibit state or local jurisdictions from adopting more stringent elevation
or freeboard requirements than those contained in the FEMA manual, consistent with
Subparagraph (b) of this Paragraph.
(b) For all manufactured and modular home installations in this state, the state and
political subdivisions may adopt laws, rules, ordinances, building codes, or other
measures to regulate installations that include additional freeboard requirements beyond
the minimum standards adopted by the National Flood Insurance Program, 42 U.S.C.
4011 et seq. in order to incentivize going above the minimum floodplain management
standards. Freeboard requirements shall be uniformly applied based on the Base Flood
Elevation established in the currently adopted Flood Insurance Rate Map for the
jurisdiction and shall not vary based on alternative or superseded mapping sources.
(c) All applications submitted to and permits issued by a jurisdiction's permit
office shall include the Base Flood Elevation at the permitted site and the required
finished floor elevation, including any applicable freeboard.
(9) The marriage line on all multisectional homes shall be sealed with industry-approved materials at the ceiling line, the floor line, and the end walls to restrict any air
infiltration into the home.
Added by Acts 1997, No. 970, §1. Amended by Acts 2000, 1st Ex. Sess., No. 92,
§1; Acts 2001, No. 500, §1; Acts 2001, No. 718, §2; Acts 2004, No. 419, §1, eff. July 1,
2004; Acts 2008, No. 217, §1, eff. August 15, 2008; Acts 2010, No. 1018, §1, eff. August
15, 2010; Acts 2017, No. 221, §1, eff. August 1, 2017; Acts 2025, No. 265, §1, eff.
August 1, 2025.