CC 1975     

Art. 1975.  Output or requirements

The quantity of a contractual object may be determined by the output of one party or the requirements of the other.

In such a case, output or requirements must be measured in good faith.

Acts 1984, No. 331, §1, eff. Jan. 1, 1985.